ClubEnsayos.com - Ensayos de Calidad, Tareas y Monografias
Buscar

Licitacion


Enviado por   •  10 de Junio de 2014  •  973 Palabras (4 Páginas)  •  140 Visitas

Página 1 de 4

With Computerized Units, in which we apply Engineering and Geological programs designed internally, we offer the best capacity of response to the particular needs of each client and project, since our engineers can attend immediately their requirements.

The T.G.T. GAMAS SAS Mud Logging is different by the capacity of analysis and reaction of its professionals that working on their own programs are even trained for instrumentally undetected situations. Remember that where the equipment fails, your project must have the human contribution and support.

At present, we rely on the service of our Computerized Unit System "On Line", which software, by being own development, allows adaptability and constant technological update. Furthermore, it possesses facilities for:

* Remote transmission of the geological data.

* Visual control of multiple perforation parameters

* Managing and presentation flexibility "friendly" to the user.

Our group of engineers and geologist will make a demonstration for you of this advanced tool of evaluation and geological record, when thus require it.

Currently, we service 3 types of units: Units high tech "online" with an expert system for data acquisition in real time operated entirely under Microsoft Windows, a software (Drill View)-developed, in the which we use the resources we provide the latest Microsoft development platform Visual Basic Net, allowing us to ensure compatibility with existing operating systems and future, enabling adaptability and constant technological upgrading.

In addition, the software was designed, so that its strength lies in the fact that it optimized for the transmission of data (numeric, graphic and master log) real-time remote client application Drill View or query using a website.

Our systems process the information based on time and depth; being able to withstand unlimited workstations in the well and our replica server installed in our Bogotá base, we have several remote points where the operating company's request.

METHODOLOGY

To accomplish these projects will be counted on two (2) Mud Loggers (Geologist) and two (2) Engineers A.D.T., (Petroleum Engineer) working in twelve shift hours each one. The work of Rig up – Rig down and maintenance of the equipment destined Project chargeable by our Electronic Engineers that will travel to the Well when the Operation conditions will demand it.

The Mud Loggers will be the direct superintendents of the operation of the equipment, gathering, updating, integrating and interpreting the information obtained through the use from the following tools between others:

a. Microscopic samples analysis (Description and Lithological Interpretation, gases and oil shows evaluations, according to the Record formats of the Operating Company).

b. Abnormal variation analysis of the drilling parameters (pressure, volume of pits, pump strokes, etc.).

The Engineer ADT, will be entrusted with gathering, evaluating and recommending the optimization of drilling parameters and the detection of abnormal pressure zones as:

- Penetration Rate average every (1, 5, 10) feet.

- Calculation and drawing of the density of the cuttings (Bulk Density - Shale Density).

- Control and plotting the temperature of the mud, with indirect calculation of the bottom hole temperature.

- Calculation and plotting of pores pressure, overburden and gradient pressure fracture.

- Plotting of total gases, connection

...

Descargar como (para miembros actualizados)  txt (6.6 Kb)  
Leer 3 páginas más »
Disponible sólo en Clubensayos.com