COATZA No. 1
BRIDGE
SUMMARY
Engineers Inc.
BAY CONTRACTING SA DE CV
MILLENNIUM ENGINEERS INC
licenced under the Laws of the Republic of Mexico, and
, of Virginia Beach, VA. USA, performed a Condition
Assessment and Analysis of the Component and Elements of the Substructure of the
Coatzacoalcos No. 1 Bridge, Located in the City of Coatzacoalcos State ofVeracruz, Mexico.
BAY CONTRACTING SA DE CV
MILLENNIUM ENGINEERS INC
regida bajo las Leyes de la Republica Mexicana y
, de Virginia Beach, VA., en Estados Unidos, realizaron
una Evaluacion de las Condiciones de los Componentes y Elementos de la Subestructura del
Puente Coatzacoalcos 1, localizado en la Ciudad de Coatzacoalcos en el Estado de Veracruz en
Mexico.
April 2008
SUMMARY
Duque de Alba No.2 South. Duque de Alba No.2 North.
2
DUQUE DE ALBA
No. 1 NORTH
DUQUE DE ALBA
No. 1 SOUTH
PHASE ONE
CLEANING OF PILES
Each of the 48 Steel Pile Elements were prepared in the following manner for
Inspection.
LIMPIEZA DE LOS PILOTES
Cada uno de los 48 Elementos Pilotes fueron preparados de la siguente manera para
A)
The North-South-East-West Quadrants of the Pile Elements were cleaned,
using high Pressure Hydroblaster 3500 psi around the horizontal circumference
along the vertical axis and for 0.30 of the Pile.
TIDAL ZONE
Los Quadrantes Norte-Sur-Este y Oeste de los Elementos Pilotes fueron
Limpiados usando una Hidroblast de alta presion de 3500 psi horizontalmente
alrededor de la Circunferencia a lo largo de los ejes verticales y por
0.30 mts del Pilote.
ZONA DE MAREAS
B)
Vertically or midway down the Pile Element between the Tide Zone and the
River Bottom a similar cleaning , as described in (A) was made.
MIDWAY
Verticalment o de la mitad para abajo del Elemento Pilote entre la Zona de
Mareas y el fondo del Rio una limpieza de la misma manera como fue descrito
en el punto (A)
PARTE MEDIA
C
Elevation River Bottom, the Final cleaning was made as described in the Tide
Zone and Mid Level procedure.
RIVER BOTTOM
Elevacion al Fondo del Rio, una limpieza Final fue llevada a cabo de la misma
Forma procedimos con la Zona de Mareas y la Parte Media.
FONDO DEL RIO
E-mail:baycontracting@yahoo.com
E-mail:baycontracting@yahoo.com
PHASE TWO
VISUAL INSPECTION
AVISUALINSPECTION
Was performed on each of the 48 Steel 24” diameter Pile Elements, under the (4) each
Pile Supported Duque deAlba´s from theWaters Surface to the River Bottom.
The following photographs are a correlation of the conditions discoreved during this
investigation, and will further demonstrate the severity of the current SteelWall conditions
visually observed.
UNAINSPECCION VISUAL
Fue realizada sobre cada uno de los 48 Elementos Pilotes de 24” de diametro, debajo de
cada uno de los (4) Pilotes Soportes de los Duques de Alba desde la Superficie del Agua
al Fondo del Rio.
Las siguientes fotografias corroboran las condiciones descubiertas durante esta
investigacion, y nos permitira mas adelante demostrar las adversas condiciones actuales
observadas visualmente de las Paredes deAcero.
1.59 mts
Duque de Alba No. 2 Norte.
Section de Pared de Pilote removida a mano.
Duke Alba No. 2 North
Section of Pile Wall removed by hand.
PHASE THREE
ULTRASONIC TABULATIONS
...