ClubEnsayos.com - Ensayos de Calidad, Tareas y Monografias
Buscar

INGLES TÈCNICO I


Enviado por   •  13 de Abril de 2020  •  Documentos de Investigación  •  665 Palabras (3 Páginas)  •  77 Visitas

Página 1 de 3

REPUBLICA BOLIVARIANA DE VENEZUELA[pic 1]

MARACAIBO- ESTADO ZULIA

UNIVERSIDAD DEL ZULIA

FACULTAD DE INGENIERÌA

ESCUELA DE PETRÒLEO

INGLES TÈCNICO I

2DO PARCIAL

ROSARIO VALBUENA, JOSÈ ANTONIO

V. 24.733.291

MARACAIBO  29 DE MARZO de 2020

  1. Formal definitions and semi formal definitions.
  1. The cementing head or retaining head is an accessory installed on top of the lining to facilitate the cementation of saidcoating.

Term (T)

Class(C)

Distinguishing characteristics

Cementing head

Is an accessory

Installed on top of the lining to facilitate the cementation of saidcoating.

Formal definition

  1. Hydraulic Breakers operate with a time delay produced by the hydraulic fluid release.

Term (T)

Class(C)

Distinguishing characteristics

Hydraulic Breakers

x

Operate with a time delay produced by the hydraulic fluid release.

.

Semi formal definition

  1. CAUSE AND EFFECT[pic 2]

Cause

Effect

Clues

Low compressibility and gas solubility

the formation volume factor for water is normally assumed to be 1.0

Because of  , for

Baja compresibilidad y solubilidad de gas

normalmente se supone que el factor de volumen de formación para el agua es 1.0

debido a , por

  1. PHYSICAL DESCRIPTION [pic 3]

Object described

Fixed Platforms

Plataformas Fijas

Physical characteristics

Dimension

Large

Grande

Shape

modular base

Base modular

Weight

x

x

Texture

x

x

Material

concrete, or steel, or a combination of both of them

Concreto, o acero o una combinación de ambos.

Capacity

x

x

Clues

up , 1.700 feet, to the seabed, depths

Arriba, 1700 pies, al fondo del mar, lo más hondo.

...

Descargar como (para miembros actualizados)  txt (3.8 Kb)   pdf (258.4 Kb)   docx (36.4 Kb)  
Leer 2 páginas más »
Disponible sólo en Clubensayos.com